Status Cadre Review proposals – DOPT

Status of Cadre Review proposals processed in Cadre Review Division of DoPT from 1st January 2016 to 31st December, 2022 (as on 10th January, 2023)

A. Approved by Cabinet

S. No.Name of the ServiceCRC*MeetingCabinet Approval
1Indian Postal Service28.12.201525.05.2016
2Central Reserve Police Force15.12.201529.06.2016
3Indian Information Service05.05.201624.08.2016
4Border Security Force29.06.201612.09.2016
5Indian P & T Accounts and Finance Service17.09.201527.10.2016
6Ministry of Micro, Small and Medium Enterprises (MSME)Indian Enterprise Development Service (IEDS)28.12.201521.12.2016
7Indian Telecom Service06.10.201621.12.2016
8Central Engineering Service (Roads)25.04.201606.03.2017
9Indian Naval Material Management Service24.10.201322.06.2017
10Indian Defence Accounts Service09.09.201619.07.2017
11Sashastra Seema Bal (SSB) (Group ‘A’ Combatised)19.7.201720.12.2017
12Central Industrial Security Force (CISF)15.05.201710.01.2018
13Indian Petroleum and Explosive Safety Service (IPESS)09.01.201702.05.2018
14Indian Railways Personnel Service19.04.201819.02.2019
15Indian Railways Traffic Service19.04.201819.02.2019
16Indian Railways Stores Service19.04.201819.02.2019
17Indian Railways Accounts Service19.04.201819.02.2019
18Indian Railways Service of Mechanical Engineers19.04.201819.02.2019
19Indian Railways Service of Electrical Engineers19.04.201819.02.2019
20Indian Railways Service of Engineers19.04.201819.02.2019
21Indian Railways Service of Signal Engineers19.04.201819.02.2019
22Indo Tibetan Border Police08.02.201923.10.2019
23Indian P&T Building Works02.08.201906.11.2019
24Indian Cost Accounts Service26.08.202025.05.2021
25Indian Railway Health Service10.06.202108.06.2022
26Medical Cadres of CAPFs, NSG & AR30.07.202101.06.2022
  • CRC – Cadre Review Committee

Under Secretary (CRD)
10/01/2023

B. Status of Proposals under consideration

S. No.Name of the ServiceStatus
(1) Meeting of Cadre Review Committee held, approval of Cabinet required-14
1Indian Defence Estates ServiceCadre Controlling Authority (CCA) to take approval of the Cabinet.
2Indian Naval Armament ServiceCCA to take approval of the Cabinet.
3Military Engineering Service (IDSE, Surveyor, Architect)CCA to take approval of the Cabinet
4Central Geological Service Group ‘A’CCA to take approval of the Cabinet
5Geological Survey of India Chemical Service Group ‘A’CCA to take approval of the Cabinet
6Geological Survey of India Geophysical Service Group ‘A’CCA to take approval of the Cabinet
7Geological Survey of India Engineering Service Group ‘A’CCA to take approval of the Cabinet
8Railway Protection Force (Indian Railway Protection Force Service)CCA to take approval of the Cabinet
9Indian Radio Regulatory ServiceCCA to take approval of the Cabinet
10Indian Corporate Law ServiceCCA to take approval of the Cabinet
11Central Health Service (CHS)CCA to take approval of the Cabinet
12Indian Ordnance Factories Health Services (IOFHS)MoHFW to take necessary action as per directions of CRC.
13Indian Economic ServiceCCA to take approval of the Cabinet
14Indian Foreign ServiceCCA to take approval of the Cabinet
(2) CRC Meeting held-1
15Survey of India Group ‘A’CRC meeting held. Necessary action on directions of CRC is being taken by the CCA.
(3) Pending for consideration of CRC- 4
16Central Labour ServiceCRC Meeting to be held on 16.01.2023.
17Central Engineering Service (Roads)CRC Meeting to be scheduled.
18Indian Skill Development ServiceCRC Meeting to be scheduled.
19Defence Aeronautical Quality Assurance ServiceCRC Meeting to be scheduled.
(4) Pending with Department of Expenditure-1
20Indian Civil Accounts ServiceCRC recommendations sent to DoE for obtaining approval of Hon’ble Minister of Finance
(5) Pending with DoPT -1
21Indian Legal ServiceReply from CCA received on 09.01.2023.
(6) Information/clarification/reply pending with CCA -3
22Indian Statistical ServiceAs per discussion in meeting held on 09.01.2023, reply from CCA is awaited.
23Indian Revenue Service (C&IT)Reply from CCA is awaited.
24Central Water Engineering ServiceReply from CCA is awaited.

Under Secretary (CRD)
10/01/2023

Click here to View / Download the Order pdf

Get Free Email Updates

Follow us on Telegram Channel, Twitter & Facebook and Whatsapp Channel for all Latest News and Updates

Leave a Reply

Scroll to Top