• Skip to main content
  • Skip to primary sidebar
  • Home
  • AICPIN
    • AICPIN for June 2022
  • Jan 2023 DA Calculator
    • Expected DA from January 2023 Calculation
  • Pay Matrix
    • 7th CPC Pay Matrix Table
  • Holidays 2022
  • Salary Calculator 2022
  • Contact Us
Gservants News

Gservants News

Latest Central Govt employees news today and 7th CPC pay matrix

Revised 7th CPC Pay Matrix
7th CPC Pay Matrix Level 1 to 5
7th CPC Pay Matrix Level 6 to 9
7th CPC P Matrix Level 10 to 12
7th CPC P Matrix Level 13 to 14 
7th CPC P Matrix Level 15 to 18
Right time to demand the constitution of 8th Central Pay Commission
Expected DA Calculator from January 2023
New Salary Calculator for CG Staff
Fitment Factor 3.68 and Minimum Pay Rs.26000
Fitment Factor and Pay Matrix Table

SOP for Facility profiling, DWS Transactions & Common bag closing – DOP

October 7, 2022 Rani

SOP for Facility profiling : Rationalization of type of bags in Parcel Hubs

F. No. 27-27/2021-PD
Government of India
Ministry of Communications
Department of Posts
Parcel Directorate

Malcha Marg Post office Complex,
Chanakyapuri, New Delhi-110021

Dated: 03rd October, 2022

To
All Chief Postmaster General
All Postmasters General

Sub: Rationalization of type of bags for Speed Post Parcel, Business Parcel, and Registered Parcels.

This is regarding the functionality of “System Assisted Sorting” developed in CSI system to assist the Sorter to carry out the Primary and Secondary sorting work Parcel Hubs.

2. As per the Parcel Directorate letter no.27-06/2021-PD dated 26.10.2021 processing of all types of Parcels have commenced in Parcel Hubs w.e.f. 22.11.2021 wherein Speed Post Parcel, Business Parcel, Registered Parcel, and Registered Packets (RPs) are being processed in Parcel Hubs.

3. In order to process all types of Parcels in Parcel Hubs following bag closing pattern is being followed at present:

A- Business Parcel, Registered Parcel, and Registered Packets

I.Post Office to mapped Parcel Hub- Separate TD & NTD Parcel Bags
II. Parcel Hub to Parcel Hub- Parcel Bag
III. Parcel Hub to mapped delivery Post Office/NDC- Parcel Bag

B-Speed Post Parcel

I. Post Office to mapped Parcel Hub- Separate TD and NTD Speed Post Bag
II. Parcel Hub to Parcel Hub- Speed Post Bag
III. Parcel Hub to mapped delivery Post Office/NDC- Speed Post Bag

4. Considering the operational work flow at Parcel Hubs and effective implementation of the functionality of System Assisted Sorting it has been decided to rationalize the types of bags closed by Post Offices to Parcel Hubs, Parcel Hubs to Parcel Hubs and Parcel Hubs to Delivery offices for effective operation of Post offices and Parcel Hubs.

5. A common bag type i.e., Parcel has been proposed to close all the types of Registered Parcel/Business Parcel/ RPs/Speed Post Parcel in place of existing Parcel and Speed Post bag type. The Parcel Bag label will be of 02 colors i.e., Yellow for Air connectivity and Blue for Surface connectivity. The bag closing pattern (as per connectivity) with this provision will be as follows: –

I. Booking Post Offices to mapped L2 Parcel Hub – Post Office will close separate TD and NTD Surface Parcel bags for its mapped L2 Parcel Hub. Here TD will be considered for all the Parcels to be delivered by the mapped delivery offices of parent Parcel hub. NTD bag will consist of Parcels other than TD parcels meant for rest of India.
II. Booking Post Offices to mapped L1 Parcel Hub- Post Office will close separate TD and NTD Surface Parcel bags for its mapped L1 Parcel Hub. Here TD will be considered for all the Parcels to be delivered by the mapped delivery offices of parent Parcel hub. NTD bag will consist of Parcels other than TD parcels meant for rest of India.
III. L2 Parcel Hub – Origin L2 Parcel Hub will close Surface Parcel bag for mapped delivery Post offices, mapped Lt Parcel Hub, and L2 Parcel Hubs within the Circle. If there is any L1/L2 Parcel Hub within the Circle where Air Connectivity is being given for Speed Post Parcels, Surface Parcel bag including Registered Parcel/Business Parcel/RPs and Air Parcel bag including Speed Post Parcel will be closed separately.
IV. L1 Parcel Hub- L1 Parcel Hub will close Parcel bags in following manner:
(a) Surface Parcel bag will be closed for its mapped delivery Post Offices/NDCs, all L2 Parcel Hubs and L1 Parcel Hubs within the Circle. If there is any L1/L2 Parcel Hub within the Circle where Air Connectivity is being given for Speed Post Parcels, Surface Parcel bag including. Registered Parcel/Business Parcel/RPs and Air Parcel bag including Speed Post Parcel will be closed separately.
(b) Circle will review the transmission arrangement from L1 Parcel Hubs within the Circle to Other L1 Parcel Hubs outside the Circle based on transmission mode i.e., Air or Surface and identify the L1 Parcel Hubs outside the Circle connected through (i) Air and Surface both (ii) Surface Only.
(c) L1 Parcel Hubs outside the Circle where connectivity is through both Air and Surface (RTN/Section/MMS):

(i) Surface Parcel bag including Business Parcel/Registered Parcel/Registered Packets will be closed.
(ii) Air Parcel Bag including Speed Post Parcel & Registered Parcel Paid with Air Surcharge will be closed.

(d) L1 Parcs Hubs outside the Circle where connectivity is through Surface only (RTN/Section/MMS), Surface Parcel bag including Business Parcel/Registered Parcel/Registered Packets and Speed Post Parcel will be closed.

v. Delivery Offices/NDC- Delivery Post Offices/NDCs will close separate TD and NTD Surface Parcel bags for RTS/Redirected parcels as mentioned in Para 5(1)
VI. BNPLI/BPC with Direct bag closing facility – These offices will close Surface Parcel bags for all its mapped delivery Post Offices/NDCs, L1/L2 Parcel Hubs within the Circle. Circle will review the mail arrangement from this facility to 4/L2 Parcel Hubs located with the Circle and Other L1 Parcel Hubs outside the Circle and manage the type of parcel Bag to be closed for L1/L2 Parcel Hub i.e., Air/Surface based on the connectivity. Surface Parcel bag including Registered Parcel/Business Parcel/RPs and Air Parcel bag including Speed Post Parcel will be closed separately.

6. Detailed SOP for closing of Air/Surface bags based on the connectivity and as per above pattern is also attached as Annexure for reference for field offices. Process flow for Bag receipt, bag opening, primary sorting, secondary sorting, bag closing and bag dispatch is also attached as Annexure-I to assist the Parcel Hubs staff.

7. It is requested that instructions may be issued to all Incharge/ Supervisor of the operative offices to so that the new bag closing pattern may be implemented. Further, it is also requested that the Yellow Parcel Bag label with Parcel Barcode series is also required to be arranged by the Circle/Region/Division to its Parcel Hubs.

For any query of clarification please write to Parcel Directorate on [email protected] indiapost.gov.in or [email protected]

Revised Bag pattern will be commenced w.e.f. 07.10.2022.

Encl: As above.

(Ajay Kumar Roy)
Chief General Manager

Click here to View/Download the Order pdf

Related posts:

  1. Calculation of Income Tax on Interest on GPF Above 5 lakhs- DOP
  2. Probation of direct recruits Multi Tasking Staff, Postman, Mail Guard & Stenographer Grade-II
  3. Standard Operating Procedure to be followed for giving appointment on compassionate grounds
  4. Printing and Supply of AAR Books, ASLAAS-5 Cards & POSB Cheques by Department of Posts

TYPE HERE THE RELATED WORD AND SEARCH ORDERS

Reader Interactions

Leave a Reply

You must be logged in to post a comment.

Primary Sidebar

Latest 7th CPC Calculators

New Salary Calculator 2023
Promotion Pay Fixation Calculator
7th CPC Gratuity calculator
In hand Salary calculator 2023
DA Calculator from July 2023
7th CPC Pension Calculator
7th CPC Commutation calculator
CGEGIS Benefits Calculator
Night Duty Allowance Calculator

7TH CPC PAY MATRIX

7th CPC Pay Matrix Level 1 to 5
7th CPC Pay Matrix Level 6 to 9
7th CPC P Matrix Level 10 to 12
7th CPC P Matrix Level 13 to 14 
7th CPC P Matrix Level 15 to 18

Central Govt Holidays 2023

Central Govt Holidays 2023
Compulsory Holidays and Restricted Holidays 2023

Latest DA and DR News

Expected DA Calculator from January 2023
18 Months DA Arrears Latest News 2023
DA Arrears Loss Calculator for 18 Months
DR Loss calculator for Freezing Period

LTC Eligibility and Block Year

LTC Rules for New Recruits
Current LTC Block is 2022-2025
LTC Block Year 2018-2021
LTC Carry Forward 2018-2021
LTC FAQ for New recruits
LTC by Air Travel guidelines
LTC by Air to NER, JK and AN
LTC 80 Air Fare Latest
Booking LTC Air Tickets

© 2010–2023 . gservants.com by Gservants News-Central Government Employees News